Post by amelsakka on Thu 01 Jan 2009, 9:02 pm

This is a summary of the design steps explained by Dr Yehia in the 4th lecture.
I hope that helps.

Click the following link, if you couldn't see the image properly here
https://redcdn.net/ihimizer/img89/8360/sewerdesignstepsfw6.png

avatar
amelsakka

Number of posts : 77
Reputation : 3
Registration date : 2008-11-14

View user profile

Back to top Go down

Re: Steps of Sewer Section Design

Post by Mana on Thu 01 Jan 2009, 9:10 pm

Thxxxxxxxxxxxxxxxxxxxxxx awy ya Ahmed
avatar
Mana

Gender : Female Number of posts : 554
Reputation : 3
Birthday : 1986-02-16
Registration date : 2008-02-29

View user profile

Back to top Go down

Re: Steps of Sewer Section Design

Post by maged on Thu 01 Jan 2009, 9:14 pm

بجد والله انت رائع
avatar
maged

Gender : Male Number of posts : 1176
Reputation : 0
Birthday : 1984-09-24
Registration date : 2008-03-02

View user profile

Back to top Go down

Re: Steps of Sewer Section Design

Post by amelsakka on Thu 01 Jan 2009, 9:22 pm

I'm available if anyone has ANY question.
Also my number is 0122224676, call ANYTIME till Saturday.
avatar
amelsakka

Number of posts : 77
Reputation : 3
Registration date : 2008-11-14

View user profile

Back to top Go down

Re: Steps of Sewer Section Design

Post by amelsakka on Thu 01 Jan 2009, 9:27 pm

By the way,, in the third question in our midterm exam,, when you get Qtotal, consider it Qdesign,, then follow the above steps.
The only difference, is that instead of assuming (D), you will assume (Vdesign) and then get (D) from A= Q/V

From this D, get the corrected D from the available diameters and go to step 5 above and continue steps.
avatar
amelsakka

Number of posts : 77
Reputation : 3
Registration date : 2008-11-14

View user profile

Back to top Go down

Re: Steps of Sewer Section Design

Post by maged on Thu 01 Jan 2009, 9:27 pm

amelsakka wrote:I'm available if anyone has ANY question.
Also my number is 0122224676, call ANYTIME till Saturday.
ooooh Merci beaucoup
Very Happyمعلش بقى اصل ثقافتي فرنسيه
avatar
maged

Gender : Male Number of posts : 1176
Reputation : 0
Birthday : 1984-09-24
Registration date : 2008-03-02

View user profile

Back to top Go down

Re: Steps of Sewer Section Design

Post by maged on Thu 01 Jan 2009, 9:29 pm

بقولك ايه يا بو حميد الاقيش معاك امتحان الميدترم ضروري
Embarassed Embarassed
avatar
maged

Gender : Male Number of posts : 1176
Reputation : 0
Birthday : 1984-09-24
Registration date : 2008-03-02

View user profile

Back to top Go down

Re: Steps of Sewer Section Design

Post by bassem zakarya on Thu 01 Jan 2009, 9:31 pm

thx ahmed for the great effort w yareet fe3lan ykoon ma3ak l midterm 3alashan ana fe3lan nasy shakl l mas2ala l talta dy kan 3amel ezzau
avatar
bassem zakarya

Number of posts : 200
Reputation : 0
Registration date : 2008-02-28

View user profile

Back to top Go down

Re: Steps of Sewer Section Design

Post by Mana on Thu 01 Jan 2009, 9:37 pm

Ahmed 7atnzel el exam wlaa anzelo ana.....
avatar
Mana

Gender : Female Number of posts : 554
Reputation : 3
Birthday : 1986-02-16
Registration date : 2008-02-29

View user profile

Back to top Go down

Re: Steps of Sewer Section Design

Post by bassem zakarya on Thu 01 Jan 2009, 9:40 pm

excuse me Ahmed i have a comment about the design steps

we will assuming "a reasonable" diameter and get Qf and we have to try more than one Diameter to reach the targeted ratio Q/Qf and that ration should satisfy that condition (y/d=2/3 for d<700mm & y/d=1/2 for d>700mm)

so....

y don't we "Begin with end in mind Very Happy".....

assume y/d (2/3 or 1/2) and using curves u can get Q/Qf and......
by knowing Q (the max of Qdwf & Qwwf) we can get Qf so we have only one unknown which will be the diameter ======= get it exactly without more trials (no need to say that it should be rounded to the nearest commercial one Very Happy)

I hope it's useful
avatar
bassem zakarya

Number of posts : 200
Reputation : 0
Registration date : 2008-02-28

View user profile

Back to top Go down

Re: Steps of Sewer Section Design

Post by maged on Thu 01 Jan 2009, 9:41 pm

Mana wrote:Ahmed 7atnzel el exam wlaa anzelo ana.....
اي حد ينزلو المهم ينزل والسلام وياريت بقى يا مانا لو معاكي الحل بتاعو
avatar
maged

Gender : Male Number of posts : 1176
Reputation : 0
Birthday : 1984-09-24
Registration date : 2008-03-02

View user profile

Back to top Go down

Re: Steps of Sewer Section Design

Post by Mana on Thu 01 Jan 2009, 9:43 pm

msh m3aya el7al w elexam isa 7aykon 10 min w 7aykon here
avatar
Mana

Gender : Female Number of posts : 554
Reputation : 3
Birthday : 1986-02-16
Registration date : 2008-02-29

View user profile

Back to top Go down

Re: Steps of Sewer Section Design

Post by hossam on Thu 01 Jan 2009, 9:43 pm

ايمان والنبى مش وقت زل يلا عشان باسم يلحق يحل اخر مساله والنبى وليكى عليه هجبلك حاجات حلوة كتير
avatar
hossam

Number of posts : 281
Reputation : 0
Registration date : 2008-03-17

View user profile

Back to top Go down

Re: Steps of Sewer Section Design

Post by maged on Thu 01 Jan 2009, 9:44 pm

Mana wrote:msh m3aya el7al w elexam isa 7aykon 10 min w 7aykon here
اشكرك بشده cheers
الحمد لله اخيرا لقيته مع حد
avatar
maged

Gender : Male Number of posts : 1176
Reputation : 0
Birthday : 1984-09-24
Registration date : 2008-03-02

View user profile

Back to top Go down

Re: Steps of Sewer Section Design

Post by Mana on Thu 01 Jan 2009, 9:46 pm

walahy barf3o now Very Happy:D Hosssam pasha lya 3andk kda wa7da wal 2olk 2 b2a Snikers Very Happy:D:D ent ely 2olt 7atgebly 7aga 7elwa Razz:P...wlaahy ya gam3a barfa3o now
avatar
Mana

Gender : Female Number of posts : 554
Reputation : 3
Birthday : 1986-02-16
Registration date : 2008-02-29

View user profile

Back to top Go down

Re: Steps of Sewer Section Design

Post by hossam on Thu 01 Jan 2009, 9:48 pm

علبة سنكرس للباشا يا ولدبسرعة
avatar
hossam

Number of posts : 281
Reputation : 0
Registration date : 2008-03-17

View user profile

Back to top Go down

Re: Steps of Sewer Section Design

Post by bassem zakarya on Thu 01 Jan 2009, 10:25 pm

excuse me Ahmed i have a comment about the design steps

we will assuming "a reasonable" diameter and get Qf and we have to try more than one Diameter to reach the targeted ratio Q/Qf and that ration should satisfy that condition (y/d=2/3 for d<700mm & y/d=1/2 for d>700mm)

so....

y don't we "Begin with end in mind Very Happy".....

assume y/d (2/3 or 1/2) and using curves u can get Q/Qf and......
by knowing Q (the max of Qdwf & Qwwf) we can get Qf so we have only one unknown which will be the diameter ======= get it exactly without more trials (no need to say that it should be rounded to the nearest commercial one Very Happy)

I hope it's useful
avatar
bassem zakarya

Number of posts : 200
Reputation : 0
Registration date : 2008-02-28

View user profile

Back to top Go down

Re: Steps of Sewer Section Design

Post by bassem zakarya on Thu 01 Jan 2009, 10:26 pm

ma3lesh edtarret a3edha tany 3alashan l nas te2raha w ya reet law 7aga msh wad7a t2olo-ly awadda7ha
avatar
bassem zakarya

Number of posts : 200
Reputation : 0
Registration date : 2008-02-28

View user profile

Back to top Go down

Re: Steps of Sewer Section Design

Post by amelsakka on Thu 01 Jan 2009, 10:32 pm

You are right, Bassem.
As I said, that was a summary of what dr Yehia explained, not my solution Smile

Anyway, don't forget to round the calculated D and also check the rounded diameter.
avatar
amelsakka

Number of posts : 77
Reputation : 3
Registration date : 2008-11-14

View user profile

Back to top Go down

Re: Steps of Sewer Section Design

Post by maged on Thu 01 Jan 2009, 11:28 pm

bassem zakarya wrote:excuse me Ahmed i have a comment about the design steps

we will assuming "a reasonable" diameter and get Qf and we have to try more than one Diameter to reach the targeted ratio Q/Qf and that ration should satisfy that condition (y/d=2/3 for d<700mm & y/d=1/2 for d>700mm)

so....

y don't we "Begin with end in mind Very Happy".....

assume y/d (2/3 or 1/2) and using curves u can get Q/Qf and......
by knowing Q (the max of Qdwf & Qwwf) we can get Qf so we have only one unknown which will be the diameter ======= get it exactly without more trials (no need to say that it should be rounded to the nearest commercial one Very Happy)

I hope it's useful
والله ياباسم فكره حلوه اوي اوي .....بس فيه حاجه
هل الدكتور هيوافق نعمل كده في الامتحان
انت عارفه كويس.. Very Happy ثم انه قال ان فيه طرق كتير للحل ولكن احنا هنحل
up to yahia
يعني اعتقد اننا لازم نلتزم بالخطوات اللي هو اداها بس ممكن نبقى نعمل زي منتا بتقول كده في الاول.. على جنب كده
وبعدين نبقى نستخدم الديامتر اللي احنا جبناه من طريقتك وكاننا فرضناه كده
ونكمل الحل عادي
Smile
avatar
maged

Gender : Male Number of posts : 1176
Reputation : 0
Birthday : 1984-09-24
Registration date : 2008-03-02

View user profile

Back to top Go down

Re: Steps of Sewer Section Design

Post by maged on Thu 01 Jan 2009, 11:37 pm

take care:
D(min)=100 for water.
D(min)=200 for sewer section.
avatar
maged

Gender : Male Number of posts : 1176
Reputation : 0
Birthday : 1984-09-24
Registration date : 2008-03-02

View user profile

Back to top Go down

Re: Steps of Sewer Section Design

Post by bassem zakarya on Thu 01 Jan 2009, 11:40 pm

la ya maged l Dr. altaf mn kda b kteer Very Happy

w ba3deen elly ana ba2oloh dah msh tare2et 7all gdeeda Very Happy

dy taree2et 7all l doctor bas b tare2a absat ya3ny ana ma3'ayyartesh fil asaseyyat
avatar
bassem zakarya

Number of posts : 200
Reputation : 0
Registration date : 2008-02-28

View user profile

Back to top Go down

Re: Steps of Sewer Section Design

Post by maged on Thu 01 Jan 2009, 11:43 pm

Very Happyوالله لو انت متاكد يبقى الكلام ده كده بيييس اوي
avatar
maged

Gender : Male Number of posts : 1176
Reputation : 0
Birthday : 1984-09-24
Registration date : 2008-03-02

View user profile

Back to top Go down

Re: Steps of Sewer Section Design

Post by bassem zakarya on Thu 01 Jan 2009, 11:46 pm

mate2la2sh
avatar
bassem zakarya

Number of posts : 200
Reputation : 0
Registration date : 2008-02-28

View user profile

Back to top Go down

Re: Steps of Sewer Section Design

Post by amelsakka on Fri 02 Jan 2009, 12:39 am

I agree with you, Bassem.
When I was asking the dr about something in the sheet problems, he said, do whatever you want, as long as you will reach the same result.
avatar
amelsakka

Number of posts : 77
Reputation : 3
Registration date : 2008-11-14

View user profile

Back to top Go down

Re: Steps of Sewer Section Design

Post by Sponsored content


Sponsored content


Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum